Project: Hebron Southern Entrance Road 

Role: General Contracting
Client: USAID
Location: Hebron - Palestine
Date: On-going
Size: 3.5 km Total
Engineer: Black and Veatch
Cost: $7,063,882.00

Reconstruction of 1.1 km of a four-lane urban main road that starts at HWY 60 and continues north into the southern area of Hebron and reconstruction of about 1.0 km of two-lane internal roads connecting to the main southern entrance road. Scope also includes milling and overlay of 0.3 km four-lane urban road towards Al Tahrir Roundabout; reconstruction of Al Tahrir and reconstruction of 0.5km four-lane urban Dura-Hebron (Sinjir) Road to connect to a recently constructed road section.