January 5, 2018- APCO/ArCon and CDPA Architects + Planners is pleased to announce it has been awarded a Design- Build Project – Ashley Homestore in Woodhaven- Michigan- USA.
This is a 35,000 Sq.Ft. tenant space in an existing building to accommodate the Ashley Homestore furniture sales. This totally new construction includes concrete floor finishing, gypsum board, painting, metal framing, millwork, storefront system, new HVAC, new plumbing system installation, extensive electrical power and lighting, fire sprinkler, fire alarm and other interior building finishes.

Read more

September 2017- APCO/ArCon is proud to announce it was selected again by USAID as one of the IDIQ holders, specifically, the small business reserve for multiple-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an overall ceiling price of $500,000,000 for the Building Foundations Program for the West Bank/ Gaza for the next five years. The Government will issue Task Orders that are Firm Fixed Unit Price (FFUP) for the construction services required under this contract.

Read more

June 10, 2017- APCO/ArCon and CDPA Architects + Planners is pleased to announce it has been awarded a Design- Build Project – Ashley Homestore in Westland- Michigan- USA.
This is a 30,000 Sq.Ft. tenant space in an existing building to accommodate the Ashley Homestore furniture sales. This totally new construction includes concrete floor finishing, gypsum board, painting, metal framing, millwork, storefront system, new HVAC, new plumbing system installation, extensive electrical power and lighting, fire sprinkler, fire alarm and other interior building finishes.

Read more

November 9, 2016- APCO/ArCon and CDPA Architects + Planners is pleased to announce it has been awarded a Design- Build Project - Schaefer Plaza in Dearborn- Michigan- USA.
This project is 10,000 Sq.ft. in area located on a busy thoroughfare designed to accommodate commercial businesses.

Read more

September 28, 2016- APCO/ArCon is pleased to announce it has been awarded the construction of Task Order No. 294-TO-16-00009- Gaza Reservoirs and Pumping Facilities under USAID Infrastructure Needs Program II (INP-II).
This Task Order comprises the construction of four new water reservoirs (3,000 and 4,000 Cu.m.) and booster pump stations, along with their associated supply and distribution pipelines (27km of HDPE pipes up to 800mm dia), in order to improve access to clean drinking water to communities residing in the Middle Area and Rafah Governorates of Gaza. Project is scheduled to be completed in July 2018.

Read more

September 26, 2016- APCO/ArCon is pleased to announce it has been awarded the construction of Task Order No. 294-TO-16-00002 as part of USAID Infrastructure Needs Program II (INP-II). This Task Order consists of 2 separate road projects distributed in the northern region in the West Bank at a total cost of $7.7. The subject roads suffer from deteriorated conditions that included worn out surface, lack of proper shoulder and traffic management signage, as well as lack of road marking to provide safe driving conditions.
The scope of this task order required the rehabilitation of the following roads:

PROJECT 1: Al Jalameh Crossing Improvement- 0.67km
Project is scheduled to be completed in Aug. 2017.

PROJECT 2: Rehabilitation of Deir Al Ghsoun - Al Jarosheyah Road- 6km
Project is scheduled to be completed in Aug. 2017.

Read more

May 19, 2016- APCO/ArCon is pleased to announce it has been awarded the construction of Task Order No. 294-TO-16-00001-Hebron Southern and Northern Entrance Roads projects under USAID Infrastructure Needs Program II (INP-II). This Task Order consists of 2 separate road projects distributed in the southern region in the West Bank at a total cost of $8.6M. The two projects are considered regional roads and the main entrances to Hebron City and suffer from deteriorated conditions that include worn out surface, lack of proper shoulder and traffic management signage, as well as lack of road marking to provide safe driving conditions.
The scope of this task order required the rehabilitation of the following roads:

PROJECT 1: Hebron Southern Entrance Road - 4.0 km
Project is scheduled to be completed in May 2017.

PROJECT 2: Hebron Northern Entrance Road – 1.0km
Project is scheduled to be completed in Dec. 2016.

Read more

September 23, 2013- APCO/ArCon is pleased to announce it has been awarded the construction of Task Order No. 294-TO-13-00016- Deir Sha’ar Main Pipeline project as part of USAID Infrastructure Needs Program II (INP-II) at a total construction cost of $16.5 million. This project is located in the southern region of the West Bank (Hebron Governorate) and designed to transmit up to 26.3 million cubic meters of potable water per year to the southern district of the West Bank. The scope of work includes the installation of 27km of main 30” pipeline and internal water networks and rehabilitation/reconstruction of 11km of existing roads. The pipeline starts at the Deir Sha’ar booster station, passes alongside and supplies water from metered turn-outs to Beit Ummar, Karmi Tzur, Al-Arrub Camp, and Halhul, and ends at the existing reservoir in Halhul.  Project is scheduled to be completed in May 2015.

Read more

September 20, 2013- APCO/ArCon is pleased to announce it has been awarded the construction of Task Order No. 294-TO-13-00015- Nhaleen Main Pipeline project under USAID Infrastructure Needs Program II (INP-II) at a total construction cost of $12.2 million. This project is located in the southern region of the West Bank (Bethlehem Governorate) and designed to serve 4 communities (Nahaleen, Wadi Fukin, Husan, and Battir) Work scope includes the installation of 25km of main pipeline and internal water networks (dia. 300mm, 250mm, 200mm, 150mm and 100mm) and reconstruction of 15km of existing roads. Project is scheduled to be completed in April 2015.

Read more

September 19, 2013- APCO/ArCon is pleased to announce it has been awarded the construction of Task Order No. 294-TO-13-00014- Multiple Roads Project in the North Area under USAID Infrastructure Needs Program II (INP-II). This Task Order consists of 2 physically separate road projects distributed in the north region in the West Bank at a total cost of $16.5 million as the following:
PROJECT 1: Nablus - Beit Iba – Deir Sharaf Road – A heavily travelled road with high visibility consisting of 5.5 km of 4 lane roadway.
PROJECT 2: Deir Sharaf – Tulkarem Road – A continuation of project 01, a heavily travelled 2.2 km two lane regional road passes mostly through agricultural valley.

Read more