Project: WATER DISTRIBUTION PIPING FOR IDNA AND DEIR SAMIT
Role: General Contracting
Client: USAID
Location: Hebron - Palestine
Date: Completed November 2010
Size: 50.25 km
Engineer: MWH
Cost: $4,689,599
The construction of distribution networks for the two villages of Idna and Deir Samit and Simia in South Hebron. Works include the installation of welded steel pipes with diameters 25mm, 50mm, 75mm, 100mm and 150mm, and the construction of valves chambers.