Project: Construction of Rafah Reservoir and Pumping Facilities
Client: USAID
Location: Gaza - Palestine
Date: On-going
Size: 4,000 Cu.m. 5.78 km Total
Engineer: AECOM
Cost: $3,107,650.11
This project includes constructing a new water reservoir 4,000 m3 and booster pump station, along with their supply and distribution piping- a total of 5.78km of HDPE pipes (225mm to 630mm Diameter).