Project: Construction of Deir Al Balah Reservoir and Pumping Facilities
Client: USAID
Location: Gaza - Palestine
Date: On-going
Size: 4,000 Cu.m. 8.63 km Total
Engineer: AECOM
Cost: $4,083,768.28
This project includes constructing a new water reservoir 4,000 m3 and booster pump station, along with their supply and distribution piping- a total of 8.63km of HDPE pipes (225mm to 500mm Diameter).