Project: Construction of Al Bureij Reservoir and Pumping Facilities

Client: USAID
Location: Gaza - Palestine
Date: On-going
Size: 3,300 Cu.m. 7.42 km Total
Engineer: AECOM
Cost: $4,425,235.23

This project includes constructing a new water reservoir 3,300 m3 and booster pump station, along with their supply and distribution piping- a total of 7.42km of HDPE pipes (225mm to 800mm Diameter).