Project: Wadi Al Balat Road

Role: General Contracting
Client: USAID
Location: Ramallah - Palestine
Date: Completed Oct. 2014
Size: 1.7 km Total
Engineer: Black and Veatch
Cost: $2,696,588.32


Rehabilitation of an existing 1.7 km two lane roadway with deteriorated surface that links Ramallah with North Governorates recently unblocked by Israeli authorities and totally located in areas B and C. Also in the scope is the reconstruction of the junction of Dura Al Qarei (Segments A and B).