Project: AL DAHRIEH AL RAMADEEN ROAD

Role: General Contracting
Client: USAID
Location: Hebron - Palestine
Date: Completed April 2009
Size: 8.2 km Total
Engineer: MWH
Cost: $3,494,691

Upgrading and improving the main road connecting Al Ramadeen Village with the rest of Hebron Governorate Villages and Towns. Rehabilitation and asphalt were included on the sidewalk, ditch, road protection, and retaining walls. The road was divided into three segments (A, B, and C) with a total length of 8.2 kilometers.