Project: Samu’- Yatta Road

Role: General Contracting
Client: USAID
Location: Hebron - Palestine
Date: Completed Sep. 2014
Size: 4.7 km Total
Engineer: Black and Veatch
Cost: $2,760,036.30

Comprised of 2 separate segments, segment A of 4.718km 2 lane main road connecting Samu’ and Yatta communities passing through unpopulated agricultural lands located in areas A and C. Segment B totally located in Area C, 438 meter serving as Samu’ entrance and connecting to HWY 60.