Project: WATER DISTRIBUTION PIPING FOR BEIT AWWA AND AL-KOM

Role: General Contracting
Client: USAID
Location: Hebron - Palestine
Date: Completed November 2010
Size: 41.58 km
Engineer: MWH
Cost: $4,649,660


The construction of distribution networks for the two villages Beit Awwa and Al-Kom Beit Mowarraq and Beit Maqdoum in South Hebron. Works include the installation of welded steel pipes with diameters 25mm, 50mm, 75mm, 100mm and 150mm. In Al-Kom group, and the construction of valves chambers.