Project: MILLING AND OVERLAY OF RAS AL JOURAH-HALHUL ROAD

Role: General Contracting
Client: USAID
Location: Hebron - Palestine
Date: Completed March 2010
Size: 0.9 km Total
Engineer: MWH
Cost: $1,129,409

Located in Hebron District. The majority of the existing road is four lanes (approximately 19m wide including the median width of 2m) with some segments where the road becomes a two lane road (approximately 10-12m wide).