Project: Qalandiya-Jabaa Road Safety Enhancement

Role: General Contracting
Client: USAID
Location: Jerusalem - Palestine
Date: Completed Aug. 2013
Size: 2.1 km Total
Engineer: Black and Veatch
Cost: $597,720.26

Upgrade safety measures for the existing Qalandiya-Jabaa Road with a total length of 2.13 km, including 591 LM of milled and overlaid stretch. The road is a three-lane arterial road located within the Governorate of Jerusalem. Roadwork is sited in Area C.