Project: Wadi Al Jeer–Al Sawahira Al Sharqiya Road (Segment B)

Role: General Contracting
Client: USAID
Location: Jerusalem - Palestine
Date: Completed Oct. 2013
Size: 1.0 km Total
Engineer: Black and Veatch
Cost: $618,115.51

Upgrade a total of 0.972 km (Segment B) of the Wadi Al Jeer–Al Sawahira Al Sharqiya Road. It is a one-lane road that starts at the Container Checkpoint, intersects with Wadi Al Jeer-Al Sawahira Al Sharqiya Road (Segment A) and ends up at Al Ezzariya Road (previously constructed by USAID). Roadwork is sited in Area C.