Project: Wadi Al Jeer–Al Sawahira Al Sharqiya (Segment A)
Role: General Contracting
Client: USAID
Location: Jerusalem - Palestine
Date: Completed Dec. 2013
Size: 2.9 km Total
Engineer: Black and Veatch
Cost: $3,926,336.45
Reconstructing a total of 2.883 km (Segment A) of Wadi Al Jeer–Al Sawahira Al Sharqiya Road. Segment A is a two lane arterial road sited in Area C and connects Wadi Al Nar Road to Al Ezzariya Road (previously constructed by USAID). This arterial road connects the northern to the southern districts of the West Bank, facilitating the thoroughfare of people and traffic and contributing to boosting the economic growth. The SOW included road widening, pavement layers construction, drainage, road marking, provision of street lighting (solar panels), and furnishing the safety furniture.