Project: Deir Al Ghsoun - Al Jarosheyah Road

Client: USAID
Location: Tulkarem - Palestine
Date: Completed Oct. 2017
Size: 5.97 km Total
Engineer: AECOM
Cost: $5,189,327.88

Rehabilitation of the main road connecting Tulkarem, Shuweika, Al Jarosheyah and Deir Al Ghsoun localities spanning Areas A, B and C. Scope of work included.

Reconstruct approximately 0.5 km of a four-lane urban road, milling and overlay with widening and sidewalks for approximately 4.0 km of a two -lane road, reconstruction of approximately 1 km of a two-lane road, installation of 1.6 km of drainage pipelines from the midst of Shweikeh section up to Wadi Al Zomar, reinstatement of about 0.3 km of the main road from Al Jaroun Roundabout to Wadi Al Zomar, construction of retaining structures and storm water drainage system, and installation of road safety features including but not limited to medians, road markings, cat eyes, traffic signs, guard rail, sidewalks, and hand rails.