|
- Construction of four (4) fully equipped school projects with a total value of $8,147,656. Part of USAID's five (5) year, $300 Million Infrastructure Needs Program (INP I) for the West Bank and Gaza. The projects completed August 24, 2009.
|
 |
JALBOON CO-ED ELEMENTARY SCHOOL, Jenin District
A 1,260 sq. m. elementary that serves 360 students with 9 fully equipped classrooms. The three-story school is located in Jalboon Village, 12 km east of Jenin Village. Additional Info |
 |
SALEM CO-ED ELEMENTARY SCHOOL, Nablus District
A 1,431 sq. m. three-story elementary school that serves 360 students. The school is located in Salem Village, East of Nablus City. Additional Info |
 |
SHOFEH SECONDARY BOYS SCHOOL, Tulkarm District
Located in Shofeh Village, 8 km southeast of Tulkarem City. A 1,976 sq. m. three-story school housing 520 students. Additional Info |
 |
QALQILIA SECONDARY GIRLS SCHOOL, Qalqilia District
A 2,178 sq. m. school that serves 600 students and consists of 15 fully equipped classrooms. The three-story school is located in Qalqilia City. Additional Info |
|
|
 |
AMERICAN ISLAMIC ACADEMY, Dearborn, Michigan
A two-story, 63,000 sq. ft. structure, housing classrooms on the second floor and laboratories, etc. on the first floor. Additional Info |
 |
AUXILIARY SERVICES AND INFANT PROGRAM, Macomb Township, Michigan
A 30,000 sq. ft. renovation to an existing engineering type building transformed into an Early Childhood Center. Additional Info |
 |
MECHANICAL ALTERATIONS AT LUTZ SCHOOL, Clinton Township, Michigan
A 51,780 sq. ft accelerated program directed in cooperation with the architect within extreme limited time and completed below the allowable budget. Additional Info |
|
|
|